THE POWER OF THE RIVER SAVA: A green path to self-sufficiency for the whole Zasavska region
The hydroelectric power plant chain on the Middle Sava is an important part of the green transition, the transformation of the Zasavska energy sector, and Slovenia’s energy self-sufficiency
Holding Slovenske elektrarne (HSE) is the largest producer of electricity from renewable sources in Slovenia, and the spearhead of the country’s green transition to a carbon-free society. All our development projects are sustainable, taking into account the progressive decarbonisation of society, its infrastructure and economy.
We are actively working to achieve the goals of the National Energy and Climate Plan, which calls for 27% of electricity generation to come from renewable sources and at least 75% to come from domestic sources by 2030. All renewable energy sources will make an important contribution to achieving this goal, but the foremost of these is hydropower, which is the most stable and reliable of all renewable energy sources and therefore forms the backbone of renewable energy production in the Slovenian electricity system. In Slovenia, the energy potential of the Sava River, which has so far only been exploited 30%, offers great opportunities.
Holding Slovenske elektrarne (HSE), which has strong links with the energy sector in Zasavje, has a concession for the use of the energy potential of the middle Sava River from Ježica to Suhadol.
The National Spatial Plan places the lower three hydroelectric power plants on the middle Sava River in the spatial context:
Suhadol HPP, Trbovlje HPP and Renke HPP, as well as water, national and local infrastructure,
on a 26-kilometre stretch of the Sava River between Litija and Zidani Most, which lies within the territory of five municipalities: Litije, Zagorje ob Savi, Trbovlje, Hrastnik and Laško.

ENVIRONMENTALLY FRIENDLY ELECTRICITY
The construction of the Central Sava hydropower plants will link all the facilities in a chain that will optimise the utilisation of the hydropower plants already built. This investment will enable the better responsiveness of Slovenia’s energy system and the optimal use of the energy potential of the Sava River. So far, it has only been 30% utilised.
In addition to the positive energy effects, the construction of the hydroelectric power plant on the middle Sava River also brings benefits to the population in the region. Hydropower plants are multi-purpose projects that provide flood and erosion protection for watercourses, national and local infrastructure (roads, bridges, bicycle links), stabilise groundwater and, consequently, water resources, create platforms for the development of tourism, recreation and sport on and by the water, and the local economy, and, through the payment of a concession fee, are also a financial resource for local budgets and the national water fund.

HE SUHADOL
HE SUHADOL
Prikaz HE Suhadol, pogled gorvodno. Strojnična zgradba na desnem bregu Save s štirimi prelivnimi polji in prehodom za vodne organizme na levem bregu Save. Ureditev lokalne ceste Podkraj Radeče na desnem bregu Save, na levem bregu Save prikaz nove ceste G2-108 Hrastnik Zidani most in obstoječe železnice.
Lokacija HE | Podkraj, pribl. 2,5 km dolvodno od cestnega mostu čez Savo v Hrastniku (pod Kajičem) |
Inštalirana moč HE | 35,5 (2 x 17,75) MW |
Srednja letna proizvodnja | 145,24 GWh |

HE TRBOVLJE
HE TRBOVLJE
Prikaz HE Trbovlje, pogled dolvodno. Strojnična zgradba na desnem bregu Save s štirimi prelivnimi polji in prehodom za vodne organizme na levem bregu Save. Deviacija glavne ceste G2-108 z izvedbo galerije.
Lokacija HE | Pribl. 1.2 km gorvodno od mostu čez Savo v Trbovljah (pri Ribiškem domu) |
Inštalirana moč HE | 32,5 (2 x 16,25) MW |
Srednja letna proizvodnja | 124,02 GWh |

HE RENKE
HE RENKE
Prikaz HE Renke, pogled gorvodno. Strojnična zgradba na desnem bregu Save s štirimi prelivnimi polji in prehodom za vodne organizme na levem bregu Save. Deviacija glavne ceste G2-108 na desnem bregu.
Ureditve na območju | Pribl. 200 m dolvodno od lesene brvi čez Savo v Renkah pri Mošeniku |
Inštalirana moč HE | 33 (2 x 16,5) MW |
Srednja letna proizvodnja | 133,84 GWh |

PRIDOBITVE
Voda – naša strateška dobrina
Zavedamo se, da je voda ena najpomembnejših strateških dobrin. Zato pri gradnji in energetski izrabi vodnega potenciala naših rek ves čas upoštevamo okoljevarstvene zahteve ter načela trajnostnega in sonaravnega razvoja, ob hkratnem zagotavljanju poplavne varnosti in primernega življenjskega prostora za vodne organizme. Vse to počnemo s ciljem učinkovitega in vsestransko koristnega zelenega prehoda Slovenije v brezogljično družbo, prilagajanja in odpornosti na podnebne spremembe ter dviga samooskrbe Slovenije z električno energijo iz obnovljivih virov.
Izgradnja HE na srednji Savi je večnamenski projekt s celo množico pozitivnih učinkov:
- Zaščita pred poplavami: hidroelektrarne skupaj s povezanimi ureditvami opravljajo pomembno vlogo pri prevajanju visokih voda, zato pomembno prispevajo k zaščiti okolja, življenja in premoženja.
- Nizki izpusti toplogrednih plinov: Hidroelektrarne, še posebej pretočne, spadajo med tehnologije, ki proizvajajo najmanj CO2 na enoto proizvedene električne energije v življenjskem ciklu. Ocenjeno je, da posamezna HE v manj kot treh letih po pričetku obratovanja prihrani vse emisije, ki so nastale za potrebe njene gradnje. Proizvodnja električne energije HE Suhadol, HE Trbovlje in HE Renke bo v enem letu v primerjavi s proizvodnjo električne energije iz fosilnih goriv prihranila okvirno 85.436 ton emisij CO2. Za primerjavo: Slovenija okvirno proizvede približno 3,5 milijona ton CO₂ letno iz elektrarn na fosilna goriva, predvsem zaradi premogovne proizvodnje.
- Kmetijstvo: voda iz pretočnih akumulacij se lahko uporabi za namakanje kmetijskih površin ali zajem požarne vode.
- Podzemne vode: gladine v pretočnih akumulacijah stabilizirajo podzemne vode in posledično vodne vire.
- Turizem, rekreacija in šport: izgradnja hidroelektrarn pomeni nove prostorske ureditve ter ima velik potencial za razvoj turizma in rekreacijskih dejavnosti ter športa. Ob hidroelektrarnah na srednji Savi bodo urejeni dodatni dostopi do vode, dostopi za ribolov ter dodatni prostori za kopanje in počitek, zgrajena bo tudi nova kajak-kanu steza. Načrtovane obnovitve ali nadgradnje prometnic bodo omogočile boljše povezave med naselji, tako preko kolesarskih poti kot z vzpostavitvijo novih pešpoti.
- Spodbujanje gospodarstva: Izgradnja ter obratovanje in vzdrževanje hidroelektrarn ustvarjajo delovna mesta in spodbujajo lokalno gospodarstvo.
- Skrb za vodni in obvodni živelj: pri načrtovanju izgradnje in umeščanja hidroelektrarn posebej skrbno obravnavamo živalski in rastlinski svet, biotsko raznovrstnost ter kakovost tal, vode in zraka. V sklopu projekta se predvidevajo prehodi za vodne organizme, prehodi za vidre in drugi ukrepi, ki pripomorejo k ohranitvi ugodnih razmer za ohranitev in nadaljnji razvoj živalskih in rastlinskih vrst.


TRAJNOSTNA PRIHODNOST
- HE so zaradi svojih obratovalnih značilnosti ter drugih pozitivnih učinkov ključen del slovenske trajnostne energetske prihodnosti, ki ga spodbuja tudi Evropski zeleni dogovor.
- HE imajo z vidika stabilnosti elektroenergetskega sistema in zanesljive oskrbe odjemalcev najboljše obratovalne lastnosti med tehnologijami na obnovljive vire energije. Ker izkoriščajo vodni tok, ki je bolj predvidljiv kot je to v primeru drugih obnovljivih virih energije, lahko proizvajajo električno energijo ves dan in vse dni v letu, državnemu elektroenergetskemu sistemu pa zagotavljajo moč in sistemske storitve.
- HE zaradi svojih obratovalnih značilnosti omogočajo vključevanje drugih nestanovitnih »zelenih« virov, kot sta veter in sonce, v elektroenergetski sistem. Odločilno prispevajo k optimizaciji obratovanja vseh virov obnovljive energije, ker lahko delujejo tudi kot hranilniki energije oz. baterije.
- HE so edina tehnologija na obnovljivi vir, ki skozi življenjsko dobo plačuje koncesijsko dajatev, ki je namenjena urejanju infrastrukture, prejemnik pa sta država in lokalna skupnost.