HPP Blanca
When?
The construction of HP Blanca is scheduled to begin three years after the start of construction of the first Lower Sava river hydropower plant.
Focus
Minimization of the impact on parts, areas and structures of natural treasures and cultural heritage.
HPP Blanca – Basic Details
- Rated flow: 500 m3/s.
- Head: 10.70 m.
- Rated output: 42.5 MW.
- Average annual production: 160 GWh.
- Useful volume: 1,390,000 m3.
- Average annual flow: 243 m3/s.
|